Context
Once an approval provider is armed, the gate fails closed (ADR-0179): a provider that cannot start, hangs or throws blocks every gated operation, including the plugin administration that would remove it. Some escape is needed, but any switch reachable from inside Studio is also a way for a requester to skip approval. Any Spring property can be set from the database through studio_config_property (ADR-0047), and plugins share the database role (ADR-0103).
Decision
- The switch is
artemis-studio.gate.break-glass=<reason>, accepted only from OS environment or JVM system-property sources. A value fromstudio_config_propertyor any other source fails startup. - While it is set, every gated operation runs and is audited
GATE_BYPASSED, the shell shows a red banner, a WARN line is logged at boot and every hour, and every approver gets an inbox item. - Held requests stay held, because running one needs the provider's
checkRun. - Studio has no other off switch. Settings in the provider's namespace carry the
GATE_INTEGRITYtrait, so changing them is itself held.
Consequences
- A broken provider is recoverable by whoever controls the deployment, with no database edit.
- Bypassing approval needs a redeploy, which is visible, logged and announced, and is not open to a Studio user however privileged.
- An operator must remember to unset it; the banner and the hourly log line make that hard to miss.
- Held requests cannot be pushed through during break-glass; they wait for the provider.
Alternatives considered
- No break-glass. Rejected: recovering from a broken provider would need a database edit.
- A Studio setting or an admin action. Rejected: anyone who can change settings could skip approval, and the database plane can set any property.
- Run held requests too while bypassed. Rejected: they were held under a policy the provider must still confirm.